Bear Creek Elementary School

Bear_Creek_after.JPG

Bond Updates

October 2018:

  • Secure lobby construction to start in November/December

At Our School

Total Estimated Project Cost: $4.2 million.

Add instructional space and classroom modernization

The bond will fund the addition of instructional multi-use space at Bear Creek, which was built in 1963. The new connected addition will include 3,300 square feet for cafeteria and 825 square feet for a kitchen. Other changes for instructional spaces includes adding ceiling fans to classrooms.

safety_50.pngSafety improvements

A new secure lobby will be constructed.

preservation_50.pngMaintenance and preservation

New roofs will be installed on several buildings at the school including B Building and C Building. Drainage issues at grass area on south end of main building. The concrete foundation will also be resealed to prevent water penetration. Playground B will be regraded and two new catch basins and a slot drain will be added to collect excess water.

Conserv_50.pngEnergy conservation

All single pane windows will be replaced with new double pane windows and new modern HVAC controls will be installed.

Tech_50.pngTechnology

New technology including a new intercom system, installing ceiling projector mounts, installing key card access for all exterior access doors, and modernizing wireless wiring.


Home of the Bears

logo-Bear-Creek-Elementary.png

Bear Creek Elementary

51 SE 13th Street
Bend, OR 97701

Opened 1963